HS Code for Blended Cements (HS 2523.29)
CEM II (Portland-composite, 65-94% clinker) and CEM III (blast-furnace, 5-64% clinker) are the low-carbon alternatives to CEM I (95%+ clinker). Blending with GGBS, fly ash, or limestone drops embedded CO2 from ~830 kg/t (CEM I) to as low as 350 kg/t (CEM III/B). CBAM Annex I; clinker factor is the primary CBAM variable.
Sample 6-digit codes
| Code | Description |
|---|---|
| 2523.21 | White portland cement |
| 2523.29 | Other Portland cement (CEM II/III/IV/V) |
| 2523.90 | Other hydraulic cements |
Typical import duty by market
| Market | Duty |
|---|---|
| European Union | 1.7% MFN; CBAM Annex I from 2026. |
| United States | 0% Section 232 (steel/Al) does not apply; some AD on Turkish/UAE cement. |
| India (BCD) | 10% |
Worked landed-cost example
40,000 MT CEM III/B 32.5N, FOB Iskenderun USD 47/MT, CIF Marseille
- · CBAM Annex I.
- · EN 197-1 for CEM I-V designation.
- · ASTM C595 for blended hydraulic cements.
- · IS 455 (PSC) / IS 1489 (PPC) India.
- · Turkey
- · Vietnam
- · China
- · UAE
- · Spain
Frequently asked questions
CBAM levy = embedded tCO2 x carbon price. CEM III/B has ~0.38 tCO2/t vs CEM I at ~0.83 tCO2/t. At EUR 80/tCO2 that's a EUR 36/t saving - roughly the difference between commercially viable and uncompetitive import when FOB is USD 40-60/t.
Destination market toolkits
Country-specific duty, VAT/GST and Incoterms practice for the top destinations for metals.
Metals landed-cost pages: every destination market
Jump straight to the metals import guide for any of the destination markets we cover.
Related commodity guides
Related tools
Sources & citations
- EU CBAM Regulation 2023/956European Commission
- CEN / EN Harmonised StandardsCEN-CENELEC
- WCO Harmonized System NomenclatureWorld Customs Organization
- WTO Integrated Database (tariff data)World Trade Organization