SSLT Global
Bulk Cargo

Draft Survey Calculator

Compute cargo quantity by draft survey with mean-of-means, trim and density corrections, deductibles, and a B/L quantity tolerance check.

Draft SurveyBulk CarrierUN ECE / ISO 22337
Reviewed against UCP 600 · Incoterms 2020 · WCO HSLast reviewed July 2026
Initial Survey (arrival, before loading/discharge)
Initial Drafts (m)
Initial Hydrostatics
Initial Deductibles (MT)
Final Survey (completion)
Final Drafts (m)
Final Hydrostatics
Final Deductibles (MT)
Cargo Quantity
26988.9MT
B/L Difference
+3488.9MT
14.85% - outside 0.5% tolerance
Initial Net Displacement
17342.7MT
Mean of means 8.610 m
Final Net Displacement
44331.6MT
Mean of means 12.310 m
Initial Corrections
10.1MT trim
Density corr. -107.4 MT
Final Corrections
20.9MT trim
Density corr. -314.3 MT

Overview & methodology

How draft survey cargo quantity is determined

A draft survey establishes cargo quantity by comparing the vessel's net displacement before and after loading or discharge. Six draft readings (forward, midships and aft, port and starboard) are averaged into a mean-of-means using the quarter-mean formula, which corrects for hull deflection. Displacement is then read from the hydrostatic tables and corrected for trim (first and second trim corrections) and dock-water density before deducting ballast, fresh water, fuel, lube oil, sludge and the vessel's constant.

The difference between the initial and final net displacements is the cargo loaded or discharged. Comparing this figure against the bill of lading quantity flags discrepancies outside the customary ±0.5% survey tolerance, which is important for claims and demurrage/despatch calculations.

Frequently asked questions

How is cargo quantity calculated from a draft survey?

Take the six drafts, compute the mean of means, apply trim (first and second) and density corrections to displacement, then subtract deductibles (ballast, fresh water, fuel, stores, constants). Cargo = final displacement on completion − final displacement on arrival.

What tolerance applies between the draft survey and the B/L figure?

Commercially, a draft survey is accepted to about ±0.5% against the bill of lading quantity. Larger differences normally trigger a re-survey, a letter of protest, or a shore-scale reconciliation before the master signs.